| India | Nhava Sheva (JNPT), Mundra, Chennai | 12–18 days | High-TDS groundwater RO, textile and dyeing effluent, pharmaceutical, food processing |
| United Arab Emirates | Jebel Ali, Port Khalid, Khalifa Port | 15–22 days | Desalination and SWRO, industrial process water, re-export distribution into the GCC |
| Saudi Arabia | Jeddah Islamic Port, King Abdulaziz (Dammam) | 18–25 days | Desalination, petrochemical and refining, power generation, project purchasing |
| Qatar | Hamad Port | 18–25 days | Desalination, LNG and petrochemical process water, bottled water |
| Malaysia | Port Klang, Tanjung Pelepas, Penang | 10–16 days | Electronics and semiconductor, palm oil and food processing, water utilities |
| Philippines | Manila, Cebu, Davao | 12–18 days | Water refilling stations, food and beverage, semiconductor, hotels |
| Indonesia | Tanjung Priok (Jakarta), Tanjung Perak (Surabaya) | 7–12 days | Bottled water (AMDK) and food plants, brackish coastal feed in front of RO |
| Vietnam | Cat Lai (Ho Chi Minh City), Hai Phong | 7–12 days | Absolute-rated pleated membranes for electronics, textile sediment control, Delta salinity intrusion |
| Kenya | Mombasa, Nairobi ICD | 20–30 days | Borehole water treatment, bottled water plants, horticulture packhouses |
| South Africa | Durban, Cape Town, Gqeberha | 25–35 days | Mining and process water, inland borehole RO, food and beverage |
| Kazakhstan | Khorgos / Alashankou rail to Almaty | 18–25 days | Brackish groundwater RO pretreatment, industrial process water |