Tanjung Priok / Tanjung Perak · 7–12 days transit
Most of the demand we see from Indonesia comes from two places: bottled drinking water plants and food manufacturing, where the job is sediment and chlorine removal in front of the filler, and coastal plants on brackish feed, where cartridge filtration exists mainly to protect the RO membranes behind it. Those are different specifications — and usually the same container.
| Segment | What they need | What we send |
|---|---|---|
| Bottled water / AMDK plants | Chlorine, taste and sediment control before filling | PP melt blown 1–5 µm plus carbon block |
| Coastal sites on brackish feed | Pretreatment that keeps RO elements alive | PP melt blown 5–20 µm, wound string, RO 4040 / 8040 |
| Food processing | Food-contact material and a micron rating that does not drift | FDA 21 CFR 177.1520 grades |
Jakarta (Tanjung Priok) and Surabaya (Tanjung Perak) both take direct sailings from Chinese ports: allow 7–12 days port to port on top of 7–15 days production. We quote FOB or CIF, and several models can share one container as long as each model meets its own 100-piece minimum. LCL works for a trial order.
We hold ISO 9001 production and CE marking, and materials used in drinking-water cartridges are FDA 21 CFR 177.1520 compliant with the documentation supplied on request. We do not hold an NSF/ANSI 42 or 53 listing, and we say so before you specify us into a tender that requires one. If your destination needs a local type approval, pre-shipment inspection or a certificate of conformity, raise it at enquiry stage and we will confirm in writing what we can and cannot provide.
100 pieces per model for cartridges and 10 pieces for RO elements. Mixed models in one container are fine, and a first order below MOQ can usually still be arranged — say so in the enquiry.
Yes. Samples are free and you cover the courier. We would rather you ran them on your own feed water than take our word for the rating.
No. We hold ISO 9001 and CE; SNI is not held. If your tender requires it, tell us at enquiry stage and we will confirm in writing what we have and do not have.
Production runs 7–15 days after the deposit is confirmed, then 7–12 days at sea. Plan four to six weeks door to door.
Hi! Need product specs or a quote?
Chat on WhatsApp