FACTORY DIRECT

Water Filter Cartridge Supplier for Vietnam

Cat Lai / Hai Phong · 7–12 days transit

Vietnam asks for two different things. In the north, electronics and food plants want absolute-rated pleated membranes with the extractables data behind them; in the south, textile dyeing and water plants want volume sediment removal, and salinity intrusion into the Mekong Delta has pushed a lot of sites into RO with cartridge pretreatment in front. Short transit from China makes small replenishment orders practical, which suits plants that cannot hold six months of stock.

Where Cartridges Actually Go in Vietnam

SegmentWhat they needWhat we send
Electronics and high-purity waterAbsolute ratings, low extractablesPES / PTFE pleated 0.22–0.45 µm
Textile and general waterVolume sediment removal, cost per elementPP melt blown 5–50 µm, wound string
Delta sites with saline intrusionRO pretreatment, membrane protectionPP melt blown plus RO 4040 / 8040

Shipping to Vietnam

Hai Phong for the north and Cat Lai / Ho Chi Minh City for the south, both with frequent direct sailings: 7–12 days port to port after 7–15 days production. Frequent sailings mean a plant can order a month of stock at a time instead of a quarter, and LCL is practical for small top-ups.

Documents and certifications

We hold ISO 9001 production and CE marking, and materials used in drinking-water cartridges are FDA 21 CFR 177.1520 compliant with the documentation supplied on request. We do not hold an NSF/ANSI 42 or 53 listing, and we say so before you specify us into a tender that requires one. If your destination needs a local type approval, pre-shipment inspection or a certificate of conformity, raise it at enquiry stage and we will confirm in writing what we can and cannot provide.

Common Questions

What is the minimum order?

100 pieces per model for cartridges, 10 pieces for RO elements. Mixed models can share a container.

Do you hold any Vietnamese certification?

No. We hold ISO 9001 and CE, with FDA 21 CFR 177.1520 documentation on request. Local approval is not held.

Which pleated membrane should I use for electronics?

PES or PTFE at 0.22 or 0.45 µm absolute, depending on what your tools accept. End-cap options are listed on each product page.

Can you support a small monthly order?

Yes. With 7–12 days transit, monthly replenishment normally costs less in inventory than holding a quarterly container.

Interested in This Product?

Contact us for pricing, MOQ, and lead time.

WhatsApp Send Inquiry