FACTORY DIRECT

Water Filter Cartridge Supplier for Kenya

Mombasa + Nairobi ICD · 20–30 days transit

Kenya runs on boreholes and harvested water as much as on municipal supply, so the first job is nearly always sediment rather than fine polishing: a 20 µm pre-filter, then a 5 µm element and a carbon block covers most small and medium plants. Bottled water producers and horticulture packhouses are the two segments we quote most, and both care about the micron rating staying consistent batch to batch far more than about brand names.

Where Cartridges Actually Go in Kenya

SegmentWhat they needWhat we send
Borehole water treatmentTurbidity, silt and iron carry-over20 µm then 5 µm PP melt blown, wound string
Bottled water plantsChlorine, taste and odour before fillingCarbon block with a PP pre-filter
Horticulture packhousesWash-water clarity and chlorine controlPP melt blown 5–20 µm plus carbon block

Shipping to Kenya

Mombasa is the entry point, and clearance plus the run to the Nairobi ICD adds roughly a week on top of the sea leg: expect 20–30 days port to port from China after 7–15 days production. If your clearing agent needs a pre-shipment inspection or a certificate of conformity before release, raise it at enquiry stage — we supply the invoice, packing list, certificate of origin and material documentation the inspection body asks for.

Documents and certifications

We hold ISO 9001 production and CE marking, and materials used in drinking-water cartridges are FDA 21 CFR 177.1520 compliant with the documentation supplied on request. We do not hold an NSF/ANSI 42 or 53 listing, and we say so before you specify us into a tender that requires one. If your destination needs a local type approval, pre-shipment inspection or a certificate of conformity, raise it at enquiry stage and we will confirm in writing what we can and cannot provide.

Common Questions

What is the minimum order?

100 pieces per model for cartridges, 10 pieces for RO elements.

Do you hold KEBS approval?

No. We hold ISO 9001 and CE; KEBS is not held, and we will put that in writing if your buyer's QA asks.

Which micron rating suits Kenyan boreholes?

Most plants we supply run 20 µm ahead of 5 µm. Where iron is the problem the pre-filter loads quickly, so a 20 µm wound element is usually cheaper to change than a 5 µm one.

How long does delivery take?

Production 7–15 days, then 20–30 days at sea to Mombasa. Allow six to eight weeks to reach Nairobi.

Interested in This Product?

Contact us for pricing, MOQ, and lead time.