Durban / Cape Town / Gqeberha · 25–35 days transit
South African enquiries split between heavy industrial and mining sites, where cartridges are doing real dirt-holding work on turbid process water, and inland food and beverage plants running on boreholes that need RO in front of the line. Durban is the practical gateway — and the inland run is what makes lead-time planning matter more than the price of a single cartridge.
| Segment | What they need | What we send |
|---|---|---|
| Mining and process water | High dirt load, tolerance for pressure drop | 50 µm to 5 µm wound string and PP melt blown |
| Food and beverage | Chlorine, taste, food-contact material | Carbon block behind a PP pre-filter |
| Inland borehole sites | Brackish feed, membrane protection | PP pretreatment plus RO 4040 / 8040 |
Durban takes most of our South African shipments, with Cape Town and Gqeberha on selected services. Sea transit here is the longest of the markets we serve: plan 25–35 days port to port on top of 7–15 days production, so six to eight weeks from deposit to site. Because a repeat shipment is expensive, we would rather build one mixed container than see you air-freight a top-up later.
We hold ISO 9001 production and CE marking, and materials used in drinking-water cartridges are FDA 21 CFR 177.1520 compliant with the documentation supplied on request. We do not hold an NSF/ANSI 42 or 53 listing, and we say so before you specify us into a tender that requires one. If your destination needs a local type approval, pre-shipment inspection or a certificate of conformity, raise it at enquiry stage and we will confirm in writing what we can and cannot provide.
100 pieces per model for cartridges and 10 pieces for RO elements. Several models can share a container, each meeting its own minimum.
No. We hold ISO 9001 and CE, and supply FDA 21 CFR 177.1520 material documentation on request. SABS is not held.
We quote to the port of discharge as standard and your forwarder handles the inland leg. Tell us the city and we will quote CIF to the closest port.
Under-ordering the pre-filter. RO elements get blamed for fouling that started with 20 µm sediment passing straight through.
Hi! Need product specs or a quote?
Chat on WhatsApp